Trail Bridge & Gully Repair

A trail bridge in Stafford Lake Bike Park improves safety while reducing erosion.

Objectives

  • Improve visitor safety.
  • Reduce erosion into the watershed.
  • Encourage exploration of bike trails now linked by bridge connection.

Features

  • 22-foot long steel bridge set on new concrete footings.
  • Eroding gully re-graded and stabilized with rip rap and rock.
  • New drainage culvert.

Documents

Timeline

  • April–May 2018: Project planning, bids, contracts
  • May–June 2018: Grading, rock channel construction, concrete abutment construction, rock slope protection construction
  • September 2018: Culvert replacement, bridge installation, hydroseeding